Contractor Zone

Contractor Information

 

 

In this section, contractors working at MACH 2022 can find key information relating to the show. If you have a technical query and cannot find the answer on this page, please email us and we will be happy to help.

Access to the Exhibitor Manual will be through GES and a link will be added when this is live.

 

MACH 2022 Site Rules

MACH 2022 is a CDM Site please read the Site Rules and Proceedure and ensure that all staff who are onsite during the build-up and breakdown have read and understood these regulations.

Technical Floor Plans

 

 

CLICK HERE

To download a copy of the Technical Floor Plans

Stand Build Regulations

A full copy of the MACH 2022 stand build regulations, which specify all building requirements and restrictions, can be found here.

If you have booked a shell scheme stand then you can download the technical specification, including all measurements, below:

Shell Scheme Specification

Stand Build Regulations

STOP THE DROP!

Stop the Drop

The MTA as the owners of MACH support the 'Stop The Drop' campaign designed to promote safe working practices when working at height. The Stop The Drop website contains, toolbox talks, information sheets and safety planning tools specifically tailored to exhibitors, organisers and contractors.

Please take a moment to review the information and resources available on the site and help us to ensure that everyone on site is safe whilst working at height.

 

Access Schedule

MACH 2021 is scheduled to take place as follows [please note this timetable is a guide only and is subject to amemndment]:

BUILD UP

Day Date Open Hours Comments Safety
Tuesday 29/04/22 0630 - 2200 Lifting of exhibits only – no exhibitor construction permitted NO ADMISSION to the halls without PPE *
Wednesday 30/04/22 0630 - 2200 Lifting of exhibits only – no exhibitor construction permitted NO ADMISSION to the halls without PPE *
Thursday 31/03/22 0630 - 1500 Lifting of exhibits only – no exhibitor construction permitted NO ADMISSION to the halls without PPE *
1500 - 2200 Lifting of exhibits & construction for space only stands over 150m
Friday 01/04/22 0630 - 2200 Lifting of exhibits & general construction - No shell scheme NO ADMISSION to the halls without PPE *
Saturday 02/04/22 0630 - 2200 General build-up NO ADMISSION to the halls without PPE *
0800 Arrival time for shell scheme dressing** NO ADMISSION to the halls without PPE*
Sunday 03/04/22 0630 - 2200 General build-up NO ADMISSION to the halls without PPE *

 

*Personal Protective Equipment - Hard hats and high visibility jackets are required. Safety shoes are strongly recommended and mandatory in lifting areas. Open shoes are not permitted anywhere on site during the build and break periods. Limited numbers of hard hats and high visibility jackets will be available to purchase from the organisers.

OPEN DAYS

    EXHIBIT
MAINTENANCE
EXHIBITION OPEN
HOURS
EXHIBIT
MAINTENANCE
DAY DATE FROM
hours
TO
hours
FROM
hours
TO
hours
FROM
hours
TO
hours
Monday 04/04/22 0630 0845 0830 1700 1700 2000
Tuesday 05/04/22 0730 0845 0830 1700 1700 1800
Wednesday 06/04/22 0730 0845 0830 1700 1700 1800
Thursday 07/04/22 0730 0845 0830 1700 1700 1800
Friday 08/04/22 0730 0845 0830 1600 See Breakdown  

 

BREAK DOWN

   
   
   
 
DAY DATE OPEN Hours COMMENTS Safety
Friday 08/04/22

1600 - 2200

General break-down (Exhibitors only)

All shell stands must be cleared of fittings before 2200 but this does not apply to machinery exhibits on shell scheme stands which are on the designated lift schedule

PLEASE NOTE THERE IS NO ACCESS TO THE HALLS FOR CONTRACTORS UNTIL 18:00 AND HIGH VISIBILITY VEST AND CONTRACTOR WRISTBANDS WILL BE REQUIRED.

NO ADMISSION to the halls without PPE after the announcement is made
Saturday 09/04/22 0800 - 2100 General break-down (all stand fittings to be removed by close) NO ADMISSION to the halls without PPE
Sunday 10/04/22 0800 - 1800 Lifting of Machinery Exhibits NO ADMISSION to the halls without PPE
Monday 11/04/22

0800 - 1200 

Lifting of Machinery Exhibits NO ADMISSION to the halls without PPE


PLEASE NOTE: The first two hours immediately after the show closes on the last day (Friday 09/04/22), have been dedicated for exhibit decommissioning. During this time all exhibit power will remain live to allow for decommissioning and removal of oil from exhibits; the power will be turned off at 1800 unless an extension is requested with the appointed electrical contractor - GES. For obvious health and safety reasons, there will be no vehicle movement within the exhibition halls until 1800 hours, or such time as it is safe to do so.

Media Partners

CO-LOCATED WITH MACH 2022